Award the construction contract to the lowest responsible bidder, Asplundh Construction, LLC, in the amount of $15,707,990.43 plus a 10% contingency, for the Platinum Triangle Electric Line Extension...
Documents:
| Staff Report | |
| 1. Exhibit A | |
| 2. Vicinity Map |